The calculation
Engine power (kW) × load fraction × operating hours ÷ 1,000 gives energy in MWh. Multiply by the entered L/MWh dosing rate, add the chosen reserve, then subtract usable stock. The additional requirement cannot be below zero.
The figures above are a planning estimate, not a quotation or a supply commitment.
Check before ordering
The crew or technical manager should validate the dosing assumptions, route, stock condition, tank capacity and reserve. This calculator supports procurement planning; it does not control dosing or establish emissions compliance.